Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester

Product Center / Battery Charge and Discharge Tester

Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester

Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester from Jinan Nenghua Electromechanical Equipment Co., Ltd., designed for Battery Charge and Discharge Tester and its series applications, with engineering customisation to load profile, process requirements and site conditions.

Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester manufacturer-direct supply with custom engineering, selection calculation, drawing confirmation and on-site commissioning.
Contact Us 0531-68684888

Product Introduction

A bidirectional power supply is a power electronic unit in which energy can flow both ways between the grid side and the load side. In the forward direction it converts an AC or DC input into the voltage and current the load needs; in the reverse direction it returns energy from the load (battery, motor, PV string or device under test) to the grid or DC bus instead of dissipating it in a resistor. Compared with the traditional single-direction supply plus dummy load, a bidirectional unit recovers more than 80% of the discharge energy and cuts the heat load and distribution capacity of a test bay to under a third.

The unit comprises an AC/DC active front end, a bidirectional DC/DC stage, a digital control platform and a protection and monitoring unit. The AC/DC stage uses IGBT or SiC PWM rectification (AFE) for four-quadrant operation with actively controlled power factor and current waveform; the DC/DC stage uses a dual active bridge (DAB), LLC/CLLC resonance, four-switch Buck-Boost or a three-level half bridge depending on voltage ratio and isolation requirements. The two stages are coupled through the DC bus, whose stability governs how smoothly the direction changes.

In practical Battery Charge and Discharge Tester installations the unit must hold its output stable against load impedance variation, ambient temperature swings and continuous duty, so device derating, thermal margin and protection thresholds all carry reserve.

Every unit is full-load burned in and waveform tested before dispatch, with a test report and wiring diagram supplied for acceptance and maintenance.

Working Principle

Four-quadrant operation is the core of bidirectional capability. Classified by the phase relation between voltage vector u and current vector i: in-phase current means rectification (absorbing active power), anti-phase means active inversion (returning active power), and quadrature means reactive compensation. Decoupled dq control sets active current id and reactive current iq independently, allowing continuous adjustment of power factor from -1 to +1, which is why a bidirectional unit can act as a load, as a source and as a reactive generator.

The AC/DC topology determines efficiency and harmonic level. A two-level voltage-source PWM rectifier is simple and suits 380 V grids and buses below 800 V; T-type and NPC three-level topologies halve device voltage stress and raise the switching harmonics, allowing filter volume to shrink by 30%–40%; the Vienna rectifier uses a three-level boost structure with one switch per phase for high power density in 10–100 kW modular units. At 8–20 kHz switching, grid current THD stays below 5% with power factor above 0.99.

The bidirectional DC/DC stage is chosen by isolation requirement. Where galvanic isolation is needed a dual active bridge is used: two full bridges coupled through a high-frequency transformer, with power magnitude and direction set by the phase shift φ, P = n·U1·U2·φ(π-|φ|)/(2π²·f·L), so a positive shift transfers forward and a negative shift reverse with symmetrical current stress. Bidirectional LLC/CLLC operation must satisfy the gain curve in both directions, so the resonant point is placed near the rated operating point. Without isolation, a four-switch Buck-Boost transitions seamlessly between step-up and step-down at efficiency up to 98%.

Control uses a voltage outer loop and current inner loop shared by both directions, switching only the sign of the reference and the limit direction, so no retuning is needed when the direction changes. In grid-tied mode a phase-locked loop tracks the grid, with software PLL more robust than zero-crossing detection under distortion and frequency drift; in island mode the unit becomes a voltage source and droop control (P-f, Q-V) shares power between parallel units without communication. On/off-grid transfer typically completes within 10 ms, with UPS or flywheel ride-through for critical loads.

The key constraints on regeneration are grid current quality and anti-islanding. At high return power the grid current must stay below 5% THD and above 0.99 power factor, otherwise upstream protection may trip or neighbouring equipment may be disturbed; anti-islanding protection (active frequency shift or impedance measurement) and low-voltage ride-through are required so the unit exits along a defined curve rather than dropping off suddenly. Where grid export is not permitted, the unit can return to a DC bus or dissipate through a brake unit to avoid bus overvoltage.

The digital control platform uses a DSP for the main control loop and an FPGA for high-speed timing and multi-channel sampling, exchanging data over a parallel bus. Current and voltage are sensed with isolated amplifiers or Hall sensors, whose sampling rate and resolution set the upper limit of loop bandwidth. Voltage and current loop crossover frequencies are set to one third to one fifth of the load time constant, balancing response and stability. Parameters can be read, written and backed up from the host computer for batch replication.

Design and testing follow the GB/T 3859 semiconductor converter standard, GB 17625 harmonic limits, GB/T 2423 environmental test series and IEC 61000 immunity requirements; export models additionally meet the relevant CE or UL clauses. Factory tests typically cover insulation resistance and withstand voltage, full-load temperature rise, efficiency and power factor, ripple and regulation accuracy, and protection trip values, with per-unit records kept for traceability.

Key Features

  • Bidirectional energy flow: rectification and active inversion share one power path, switching seamlessly between charge and discharge within 10 ms with no contactor and no inrush current.
  • Four-quadrant operation: power factor continuously adjustable from -1 to +1, so one unit serves as source, electronic load, reactive compensator and harmonic generator.
  • High regeneration efficiency: discharge energy returns to the grid at ≥95% (round-trip ≥93%), saving over 80% compared with resistive dummy loads and reducing test-room cooling load.
  • Modular parallel and redundancy: N+1 parallel operation with hot-swap modules and current sharing within 3%, so a failed module is covered by the rest and can be replaced without shutdown.
  • Industrial or automotive-grade components are used, with capacitors, fans and contactors selected for long life.
  • Structural parts are phosphated and powder coated with stainless fasteners for humid and corrosive workshops.

Main features:

Technical Parameters

ModelBattery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester
CategoryBattery Charge and Discharge Tester series
Rated power5 kW–1 MW (single unit or parallel)
Voltage rangeAC 380 V ±15% / DC 0–800 V (extendable to 1500 V)
Current range0–100% rated, continuous in both directions
Efficiency≥95% regenerating / ≥96% rectifying
Power factorContinuously adjustable -1 to +1, THD ≤5%
Related ratingsCustomized to application (Battery Charge and Discharge Tester series)
CoolingWater-cooled / air-cooled by power class
ProtectionOvervoltage, overcurrent, short circuit, overtemperature, phase loss, interlock
CommunicationRS485 Modbus / Ethernet / analogue (optional)

Parameters above are for reference; final specs subject to the technical agreement / order contract. Non-standard customization is available.

Applications

  • EV and V2G: bidirectional on-board charger operation, V2G/V2H/V2L export and bidirectional energy flow between chargers and the grid.
  • Motor and e-drive testing: motor back-to-back testing, controller efficiency mapping and braking energy recovery, replacing resistive dissipation by returning dynamometer energy to the DC bus.
  • PV and grid simulation: PV array I-V curve emulation and grid voltage, frequency, harmonic and sag simulation for inverter certification and low-voltage ride-through tests.
  • DC microgrids and energy routers: multi-port dispatch, DC bus voltage support and power coordination between storage, PV and charging piles.
  • Battery charge-discharge test and formation: formation, grading, cycle life and rate testing of lithium, sodium-ion, lead-acid and flow batteries, with discharge energy returned to the grid and dozens of channels per cabinet.
  • Energy storage and PCS: bidirectional charge-discharge control, on/off-grid transfer, SOC balancing and primary frequency response, working with BMS/EMS for peak shaving and demand management.

Typical applications of Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester include:

Selection Guide

First decide whether grid export is required: where permitted, choose a model with anti-islanding and interconnection protection, since return efficiency and current quality drive the savings; where not permitted, choose DC bus return or brake dissipation.

Define the required transfer time: 10 ms is adequate for most tests, while motor back-to-back and on/off-grid transfer may need under 4 ms, which sets the bus capacitance and control bandwidth.

When paralleling units or building test cabinets, check total return power against the distribution transformer rating; return power should not exceed 30% of the upstream transformer capacity, and upstream protection settings must be verified.

Paralleling and redundancy are common means of improving availability. Modules share current by master-slave or droop control with errors within 3%. In an N+1 arrangement a failed module is automatically replaced by the remaining units and can be withdrawn for replacement online. Paralleled systems need a common voltage reference and slew rate to avoid circulating current, and DC-side sharing reactors or separate output cables further suppress imbalance.

If the local grid fluctuates or large equipment starts frequently, verify the input undervoltage and overvoltage protection range and the auto-recovery strategy.

Operation & Maintenance

Cooling and maintenance: water-cooled models require stable water quality and flow, with periodic cleaning of the plate heat exchanger and strainers, and draining before freezing weather. Air-cooled models need regular cleaning of inlet filters and heatsinks to prevent derating from blocked airflow. After long shutdown, perform an insulation check and low-voltage trial run before returning to service.

Paralleling and redundancy are common means of improving availability. Modules share current by master-slave or droop control with errors within 3%. In an N+1 arrangement a failed module is automatically replaced by the remaining units and can be withdrawn for replacement online. Paralleled systems need a common voltage reference and slew rate to avoid circulating current, and DC-side sharing reactors or separate output cables further suppress imbalance.

High altitude and extreme environments impose additional requirements. Above 1000 m the dielectric strength and cooling capability of air both fall, so derating of 5%–10% per additional 1000 m and larger clearances are applied. Low-temperature sites need low-temperature electrolytic capacitors and anti-condensation heaters, while humid sites need conformal coating and condensation control. Outdoor models also require sun, rain, dust and theft protection with cabinet temperature held by air conditioning or heat exchangers.

Fault diagnosis and predictive maintenance rely on comprehensive monitoring points. The unit continuously acquires bus voltage, output current, device temperature, coolant flow and fan speed, triggering alarms or derating according to severity and storing fault codes, timestamps and key waveforms in non-volatile memory. Host software exports historical curves and estimates remaining life from accumulated operating hours and thermal cycles, turning corrective maintenance into planned maintenance.

FAQ

What is the difference between a bidirectional supply and a supply plus electronic load?
A single-direction supply can only source; discharge energy must be burned in an electronic load, and the user pays for both the electricity and the cooling. A bidirectional unit returns about 95% of discharge energy to the grid, saving tens of thousands of yuan per bay per year and eliminating the dummy load and its cooling. The trade-off is that grid interconnection and the associated protection are required.
Does regeneration disturb other equipment on the same feeder?
As long as grid current THD stays below 5% and power factor is close to unity, the return current is nearly sinusoidal and in phase with the grid, so the impact is comparable to an ordinary variable frequency drive. Return power should be kept below 30% of the upstream transformer rating, with matching filtering and protection on the distribution side when several units regenerate at once.
Will the load see a dip or a surge when the direction changes?
With a shared power path, changing direction only changes the sign of the current reference and the limit direction while bus voltage stays regulated, so the transition completes within about 10 ms with load voltage variation below 2%. For loads that cannot tolerate any interruption, choose a model with bus energy storage or a parallel UPS to bring the transfer time under 4 ms.
What are the installation requirements for Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester?
Install in a well-ventilated area free of conductive dust and corrosive gas, with ambient temperature from -10 to 40 °C (up to 50 °C for water-cooled models) and at least 800 mm maintenance clearance front and rear. Water-cooled models require circulating water at the specified pressure and flow with inlet temperature not above 32 °C. Ground resistance should be below 4 ohm and power and signal cables should be routed in separate trays.
What is the lead time and customisation scope for Battery Charge and Discharge Tester / Vehicle-Mounted Battery Charge and Discharge Tester / Compact Battery Charge and Discharge Tester?
Standard ratings are delivered within the agreed period after contract effectiveness. Output voltage, current, communication protocol, cabinet dimensions and protection class can all be customised; custom models require load characteristics, operating environment and interface requirements for the electrical and mechanical design.
← Shore Power Charging Pile / Redundant Shore Power Charging Pile / High-Frequency Shore Power Charging Pile DC-DC Converter / Water-Cooled DC-DC Converter / High-Voltage DC-DC Converter →